Survey Report Requirements
General
The report should be typed, in the English language, on company letterhead and signed by the surveyor who was responsible for the work and the principal of the company with the company seal and COEPP registration number.
Title Page
Include the project name, address, company name, date of survey, and the address of the property.
Introduction
This should include the scope of survey works, date of survey, including a summary of the planned and actual programme of work and the delivery schedule.
Personnel and Equipment
This should be a description/listing of the survey equipment (including serial numbers), surveying software (for data capture and processing), and the staff employed on the project.
Methodology
Survey Network: This should be a description of the methods employed and the control used.
Adjustment Procedure: This should provide a description of the method of adjustment for the horizontal and vertical networks, including GNSS and Star*Net listing (.txt file) or computations.
Detail Survey: The method used to capture the survey details.
- It should include a quality management report describing the quality assurance procedures used to test the accuracy, completeness, and reliability of data in the field, during processing, and the results of tests, including an interpretation of the results supplied.
Deliverables
This should be an explanation and listing of what has been delivered.
Conclusions and Recommendations
This should include comments on the specification, results, and recommendations for future work.
Appendices
- Schedule of control if any that was used, and new control established with description.
- Horizontal and vertical control network diagrams (true to scale or schematic).
- Traverse Control Observations, Bowditch Traverse Closures, and/or Least Squares Block Adjustment of traversing.
- Photographs of the site.